Discovery

We begin by understanding your vision. In this first meeting, we will establish the following -

Key Documents & Approvals

Approvals_1.png

Scope of Work

Scope.png

Your Design Preferences

Preferences.png

Planning

Based on your requirements, we prepare the following

Architectural Plans

Architecture.png

Structural Plans

Structure.png

Design
Specifications

design specs_1.png

Detailed Cost Estimation

Estimate.png

2 Weeks

Clarity in brief & design preferences produces a more accurate estimate

Preparation

Before we start constructing, we do the following in preparation

Centerline Drawing

centerline.png

Used to mark the plan on the site

Earthwork

earthwork.png

Begins after the site markings are approved

Site Set-up

Site prep_2.png

Protective fencing & Sanitation for workers

Foundation & Structure

We take every step needed to build a sturdy, long-lasting skeleton

Earth Excavation & Pest Control

pest control.png

Before PCC

PCC / Raft Foundation

raft foundation_1.png

The first layer - a bed of concrete that acts as a moisture barrier

Sump Construction

sump_2.png

-

Column Footing & Isolated Column Work

column footing.png

-

Columns

column upto grade beam.png

-

Grade Beam Casting

grade beam.png

-

Earth Filling

earth.png

-

Pest Control & Floor PCC

floor.png

-

Columns 

column roof.png

Upto the roof level

Staircase Work

staircase.png

Upto the first floor

Roof Slab

centering.png

Centering, bar bending & concreting

Upper Floors

repeat.png

The process repeats for the upper floors

Brickwork & Finishing

Once the shell is done, we start on everything in-between

Brickwork

brickwork.png

After slab deshuttering

Sill slabs, Lintels & Sunshades

Lintel Sill.png

Installed

Door Frame

door frame.png

Fixed

Electrical Conduits & Switch Boxes

switchbox.png

Fitted

Chicken Mesh

chicken mesh.png

Applied to beam / brick joints to prevent cracks

Internal Plastering

PLASTER.png

After electrical and frameworks

Putty & Base Painting

Putty.png

2 coats of putty on the wall

Plumbing & Waterproofing

Kitchens, bathrooms and other water prone areas are made leak-proof

Plumbing Lines

plumbing line.png

Laid in bathrooms and kitchens

Floor Waterproofing

waterproof.png

Before the tiles are laid

Drainage Piping

drain.png

Floor drain piping completed & pressure tested

Terrace Waterproofing

terrace waterproofing.png

Before the weathering course

Flooring & Roofing

From the floor, to the ceiling - we've got you covered

Tile, Marble or Granite

tiling.png

Laid as per the design

Terrace Weathering Course

weathering.png

Applied with thermal / pressed tiles

Rainwater Pipes

MEP icon_1.png

Installed

Parapet Wall

parapet wall.png

Finished with sill slab for crack protection

External Works

We then focus on building a safe and aesthetic compound

Compound Wall

compound.png

-

Landscaping

landscaping_1.png

-

Gate

gate_1.png

Grill fabrication & installation

Final Fixes & Handover

We make sure everything is ready for use before handover

Fittings

Light fittings.png

Electrical fittings, light fixtures & air conditioners

Paint

Final paint.png

One coat of finishing paint

Snag List

snag list.png

Installed